Press the left button, drag the mouse, rotate the cube, see more information

Limit Discounts

Through this webpage, choose online customer service communication, or message board. Leave your needs and get limited time discounts, up to 10% off, saving you a fortune. This discount has an indefinite period, and places are limited on a first-come, first-served basis.

Payment Method

We support various payment methods:
T/T payment
VISA
paypal
MasterCard
Alipay etc
Save time in your buying process.

Certified Product

The company's products have passed multiple national
certifications:
for example:
United States: ASME
EU: CE
Eastern Europe: EAC
Russia: GOST
Singapore: MOMO
etc
Buy products, buy with confidence, use with confidence

Product Type

Domestic hot water and heating series: gas hot water boiler, vacuum hot water boiler, vertical atmospheric pressure hot water boiler, electric hot water boiler Factory use, high temperature steam: wns fuel gas steam boiler, szs water tube steam boiler, vertical steam boiler, electric steam boiler

About Us

FANGKUAI is founded in 1998, which is a clean fuel boiler enterprise integrating R&D, manufacturing, sales and service. In the past 20 years of development and innovation, the company has grown into a global enterprise, and its products have been exported to more than 80 countries including Russia, Mongolia and Thailand, and have established long-lasting cooperative relations with local enterprises!

Contact Us

If you are interested in our company or products, you can contact with us through online consulting, demand table submission, e-mails and telephones. Our staff shall wholeheartedly provide product information, application knowledge and good service for you.

LTSH boiler tube inspection in power plant by in-house

  • Offshore price : $20000-$100000 Get a quote on the right form
  • Minimum order quantity : 1 set :LTSH boiler tube inspection in power plant by in-house
  • Supply Capacity : 10 units/month :LTSH boiler tube inspection in power plant by in-house
  • Manufacturer/Brand : Fangkuai boiler
  • Port : Anyang
  • payment terms : Letter of Credit, Wire Transfer, VISA

Leave Your Message And Get Price!

I need the quotation of , the fuel is , this capacity is , use for . My Name is , my Email is , my WhatsApp is , Please Send the detail information for me!

Popular products

HOT

θrion Gas Fired Steam Boiler

Capacity:1-20t/h

Rated thermal efficiency: 100-104%

Fixed working pressure: ≤1.6MPa

Applicable fuel:natural gas etc.

consult
HOT

Gas(oil) Fired Integrated Hot Water Boiler

Capacity:0.7-14MW

Rated thermal efficiency:96-98%

Fixed working pressure:≤1.25MPa

Applicable fuel:Natural gas, light oil, etc.

consult
HOT

H6 Gas Fired Hot Water Boiler

Capacity:0.7-2.8Mw

Rated thermal efficiency: 97.2-106%

Fixed working pressure:0.1MPa

Applicable fuel:Natural gas, etc.

consult
HOT

T7 Vacuum Hot Water Boilerr

Capacity:2.8-7.0Mw

Rated thermal efficiency:≥105.5%

Fixed working pressure:-0.02MPa

Applicable fuel:Natural gas, etc.

consult
HOT

V6 Gas Fired Hot Water Boiler

Capacity:99Kw

Rated thermal efficiency:97.2-104.4%

Fixed working pressure:1.0MPa

Applicable fuel:Natural gas, etc.

consult
HOT

Electric Steam Boiler

Capacity:0.5-4.0 t/h

Rated thermal efficiency:98%

Fixed working pressure:≤1.25MPa

Applicable fuel:electric energy

consult

Leave us a message

We will send out plans and quotations within five minutes

Name (optional)

Email

Whatsapp

Choose product type

Message

boilermanufactory

Get display discount

boiler
Contact us

Global Sales Hotline:
0086-371-60922096

Email: [email protected]

Voicemail
  • NTPC Tenders - National Thermal Power Corporation Tenders

    Feb 07, 2022 · National Thermal Power Corporation Limited - Multi State. 30961679 auction sale of 1. s.s.shield (boiler tube) 2. scrap steam coil air pre heater module (ms) 3. ss coal nozel pipe and tip 4. scrap transformer( gt-7r) (gt 5. scrap o & m ferrous old ( electrical fitings) 6. scrap o & m ferrous mixed 7. srap o & m ferrous mixed 8.Get Price

  • Updation of Status of Various Contracts - MAHAGENCO

    38 Contract for the work of Inspection of Boiler water wall tube and corrosion mapping by Remote Field Electromagnetic Testing (RFET), in Unit No.2 (210MW) boiler at BTPS, Deepnagar. 4500061124/ No.07015 dt.10/08/201 5 M/s.Kanwade And Associates, Ahemadnagar 3202830.00 No Deviation 2 39 Contract for the work of internal inspectionGet Price

  • Power Plants & Boilers - Walchandnagar Industries

    First Solid Municipal Waste Power Plant in India – EPC 42 TPH Boiler for New Zealand dairy Industry. 44MW Power Plant on EPC 1 basis, 2×115 TPH, 110 Ata, 540 Deg.C Boilers, Project : TSK Warana Power Co. Ltd. Warananagar, IndiaGet Price

  • B&W Learning Center Articles - Babcock & Wilcox

    The following article identifies safety precautions individuals should follow when working in or near a boiler or other equipment found at power plants. Operating instructions usually deal primarily with the protection of equipment. Rules and devices for personnel protection are also essential, regardless of the type of boiler design or fuel.Get Price

  • Coal-Fired Industrial Boiler Inspection Guide

    EPA 340/Liming5 Coal-Fired Industrial Boiler Inspection Guide by PEDCo Environmental, Inc. 11499 Chester Road Cincinnati, Ohio 45246-0100 Contract No. Liming10 Work Assignment No. 9 EPA Project Officer: John Busik EPA Task Manager: Howard Wright U.S. ENVIRONMENTAL PROTECTION AGENCY Stationary Source Compliance Division Office of Air Quality Planning …Get Price

  • B&W History of Power Production » Babcock & Wilcox

    B&W wins a contract to supply Sumitomo Corp. with two 660 MW coal-fired boilers for its Tanjung Jati power plant in one of the first independent power projects awarded in Indonesia. 1998 B&W customers can submit online orders for boiler parts, a feature that makes B&W the first company in the power generation industry to offer formalized web Get Price

  • What is a Reheater in Boiler | by Aswini Palo | Medium

    Jan 20, 2019 · Until now the use of superheater is still very popular, especially in large water-tube boiler steam power plant. Water-Tube Boiler The picture …Get Price

  • SRISAILAM MAY 2009

    Boiler was lighted up on 03.05.09. DC-EOP could not be put in service. Unit was synchronized on 06.05.09, after resolving DC-EOP problem. From 06.05.09 to 25.05.09 unit was running at 95 – 100 MW. ? Unit tripped on 26.05.09 due to LTSH tube leakage in second pass front steam cooled wall. Leakages were observed in two tubes.Get Price

  • Use of Cold Air Velocity Test (CAVT) to Locate Erosion

    service condition in coal fired thermal power plants causes failures as the effects of high temperature, erosion, stress, vibration and corrosion combined to yield failure of the boiler tubes. In pulverized coal-fired power stations, about 20% of the ash produced in the boilers is deposited on the boiler walls,Get Price

  • 4th Class Power Engineering Unit B5: Energy Plant

    b. prevent water vapour from entering the power plant. c. hold the manway doors closed. d. prevent air from entering the boiler during water contraction. d. Small boiler leaks: Select one: a. are difficult to find. b. may not be noticeable while the boiler is operating. c. happen in all boilers.Get Price

  • LTSH boiler tube inspection in power plant by in-house

    LTSH boiler tube inspection in power plant by in-house developed Robotic inspection system Rakesh Kumar Chakraborty and Kishore Aggarwal NTPC Energy Technology Research Alliance (NETRA), Plot No. 3E, Udhyog Vihar, Sector-Ecotech-II, Greater Noida, Uttar Pradesh, INDIA [email protected] & [email protected]Get Price

  • Power Plant Maintenance: What Is Required and How Drones

    Inspections of the inside of an asset, like a tank or boiler, are among the most frequent —and difficult—types of inspections carried out during power plant inspections. Using a drone removes human risks at this stage, as it removes the need for a …Get Price

  • High Pressure Boiler Plant, Tiruchirappalli - 620 014

    the tubes AND 5 % NOTCH for ut test shall be the acceptance criteria for the acceptance of tubes by the bifurcates manufacturer. 2.3 Inspection of bends for bifurcates 2.3.1 The bends shall be 180 deg bends with the bend radius as given in the drawing. 2.3.2 There shall not be any twist in the bends manufactured.TheGet Price

  • Boiler Systems for Industrial Steam Power Plants | GE

    Pulverized Coal Boilers. Our pulverized coal (PC) boilers generate steam power for large-scale global power projects with up to 1350 MW electrical output for coal units at pressures and temperatures that enable net plant efficiencies of up to 50%. Our two-pass and tower boilers can reach up to 330 bar/ 650°C /670°C in both single and double Get Price

  • Interim Report of Activities rev - CEA

    from new construction of large scale power plants under Ultra Mega Power Projects (UMPP). -Visual Inspection for Condition Assessment of Boiler Tubes (1st Pss) Electrical Hardness test on ECO, Boiler drum, LTSH & PLSH. VI, PT & DIM on Feed water piping, Water wall Panel and SHH-4, 5 & 6.t - Replica on PRDS Line. VI, PT & DIM of Feed Get Price

  • Boiler Repair and Maintenance Services | GE Steam Power

    Boiler repair and maintenance . We want your boilers to perform around the clock with the highest possible plant availability. With an installed base of 1,700 boilers, we have extensive experience and expert field engineers to assess your boiler's condition, troubleshoot and train your operational team for proper boiler maintenance and repair.Get Price

  • NITIN CORPORATION th Floor, - corponit.com

    9 ata 5 TPH 3 ata 30 TPH Power Generation at Extraction Mode 22.90 MW Power Generation in Condensing Mode 25.00 MW Boiler 1 No. Make Cethar Vessels (P) Ltd. - Thiruchirapalli Capacity 110 TPH Type CFBCGet Price

  • Boiler tubes | IBR Pipes - Jindal

    Boiler Tubes. All power devices operate at high efficiencies required quality steel tubes, to guarantee their safe and long term operation. These Tubes are called as Boiler Tubes. Boiler Tubes are specially manufactured to withstand high pressure and temperature. Boiler tubes are used in energy type equipments like steam pipeline, boilers Get Price

  • Boiler Operation Maintenance & Safety Study Guide Boiler

    Inspections A boiler internal inspection is performed to allow the boiler inspection a view of all internal surfaces, i.e. tubes, shell, drum, welds, refractory, etc. The boiler is taken off line, cooled, drained, opened and cleaned in preparation for the internal boiler inspection.Get Price

  • Power Generation Equipment - Trading in China, Industrial

    boiler: boiler feed pump: water circuit: main feed control valve: economiser: boiler drum: down comer: water wall tubes: boiler filling pump p13: steam circuit: primary superheater (ltsh) secondary superheater (final sh) main steam stop valve: reheater(hot and cold) safety valve(sh, rh and drum) steam cooled wall (supply tubes) flue gas path Get Price

  • EPRI declares war on power plant boiler tube failures

    Smock, R W. 1990. "EPRI declares war on power plant boiler tube failures". United States. abstractNote = {This paper describes an EPRI demonstration program aimed at reducing boiler tube failures (BTF) at ten utilities. The formal BTF prevention program includes participation from operations, engineering, maintenance, and management.Get Price

  • Evaluating the effectiveness of a boiler plant's

    May 20, 2021 · A boiler plays a vital role in the process of generating electricity, hence power plants need to invest in effective maintenance strategies that ensure the boiler equipment and components are well maintained and function with minimal failures. As the technology evolves, the design of boiler equipment has also become more complex which has resulted in power …Get Price

  • Fin Tube Boiler Power Plant - Seamless Steel Pipes

    LTSH boiler tube inspection in power plant by in-house Fin Tube Boiler Power PlantGeometrical Complexities Boiler tubes of the fossil power plants consists of hundreds of steel tubes with diameter varying from 38 mm (Economizer) to 63 mm (water wall tubes) and over 75 m height. LTSH coils tubes are the boiler tubes which heat the low temperatureGet Price

  • Safety | Boiler inspection and maintenance | Plant Services

    Dec 03, 2009 · Regular inspections also can extend the life of the vessel. As every plant owner and manager knows, industrial boilers are a major investment, costing upwards of $200,000. Key boiler safety features. Boilers have a variety of safety features designed to prevent accidents and keep them functioning at optimal efficiency.Get Price

  • Maharashtra State Power Generation Company

    Reduction in boiler tube leakage by atleast 1 per year DPR-33 Supply of complete LTSH Coil for Unit-3 L&T, MHPS Boiler, Hariyana Reduction in BTL 1 b) Erection of (67 nos. Upper & Lower Modules each. 01 Module = 02 Coils) LTSH Coil for Unit-3 Power plant cannot be run without arrangement for deposition of ash Time extension was proposed Get Price

  • LTSH boiler tube inspection in power plant by in-house

    Corpus ID: 31607864 LTSH boiler tube inspection in power plant by in-house developed Robotic inspection system R. Chakraborty, K. Aggarwal Published 2016 Boiler Tube failure is the prime reason of the forced outages at Fossil power plants.Get Price

  • SRISAILAM MAY 2009

    Boiler was lighted up on 03.05.09. DC-EOP could not be put in service. Unit was synchronized on 06.05.09, after resolving DC-EOP problem. From 06.05.09 to 25.05.09 unit was running at 95 – 100 MW. ? Unit tripped on 26.05.09 due to LTSH tube leakage in second pass front steam cooled wall. Leakages were observed in two tubes.Get Price

  • Boiler Tube Remaining Useful Life Assessment and Extension

    As a result, early tube failures are avoided and the lifespan of the superheater or reheater is optimised. The use of all three products – TubeAlert, TubeTech and TubeMod – can help your power plant operators manage and maintain the integrity of boiler tubes, and provide the solutions for extending the life of your boiler tubes.Get Price

  • Waygate Technologies | BRIC: Boiler Robot for Inspection

    Mar 26, 2021 · Cleaning and inspection of boilers without human entry. No scaffolding, only data.Industrial boiler cleaning and inspection is critical during plant turnarouGet Price

  • Damodar Valley Corporation

    "Procurement of Boiler Tube shield for Economizer, LTSH, Screen tube,and Superheater tube of Unit # 1& 2, KTPS,DVC" 97,83,00.00 9.78 153 DVC/Cash Purchase/KTPS/Boiler & Coal Mill Maint./Supply/00068 100000046709 25/06/2019 APH gearbox bearings 1,99,40.80 154 DVC/Cash Purchase/KTPS/Boiler & Coal Mill Maint./Supply/00067 100000046671 28/06/2019Get Price

Discount
7X24 Online