Press the left button, drag the mouse, rotate the cube, see more information

Limit Discounts

Through this webpage, choose online customer service communication, or message board. Leave your needs and get limited time discounts, up to 10% off, saving you a fortune. This discount has an indefinite period, and places are limited on a first-come, first-served basis.

Payment Method

We support various payment methods:
T/T payment
VISA
paypal
MasterCard
Alipay etc
Save time in your buying process.

Certified Product

The company's products have passed multiple national
certifications:
for example:
United States: ASME
EU: CE
Eastern Europe: EAC
Russia: GOST
Singapore: MOMO
etc
Buy products, buy with confidence, use with confidence

Product Type

Domestic hot water and heating series: gas hot water boiler, vacuum hot water boiler, vertical atmospheric pressure hot water boiler, electric hot water boiler Factory use, high temperature steam: wns fuel gas steam boiler, szs water tube steam boiler, vertical steam boiler, electric steam boiler

About Us

FANGKUAI is founded in 1998, which is a clean fuel boiler enterprise integrating R&D, manufacturing, sales and service. In the past 20 years of development and innovation, the company has grown into a global enterprise, and its products have been exported to more than 80 countries including Russia, Mongolia and Thailand, and have established long-lasting cooperative relations with local enterprises!

Contact Us

If you are interested in our company or products, you can contact with us through online consulting, demand table submission, e-mails and telephones. Our staff shall wholeheartedly provide product information, application knowledge and good service for you.

SECTION 23 5233 WATER-TUBE BOILERS PART 1 GENERAL

  • Offshore price : $20000-$100000 Get a quote on the right form
  • Minimum order quantity : 1 set :SECTION 23 5233 WATER-TUBE BOILERS PART 1 GENERAL
  • Supply Capacity : 10 units/month :SECTION 23 5233 WATER-TUBE BOILERS PART 1 GENERAL
  • Manufacturer/Brand : Fangkuai boiler
  • Port : Anyang
  • payment terms : Letter of Credit, Wire Transfer, VISA

Leave Your Message And Get Price!

I need the quotation of , the fuel is , this capacity is , use for . My Name is , my Email is , my WhatsApp is , Please Send the detail information for me!

Popular products

HOT

θrion Gas Fired Steam Boiler

Capacity:1-20t/h

Rated thermal efficiency: 100-104%

Fixed working pressure: ≤1.6MPa

Applicable fuel:natural gas etc.

consult
HOT

Gas(oil) Fired Integrated Hot Water Boiler

Capacity:0.7-14MW

Rated thermal efficiency:96-98%

Fixed working pressure:≤1.25MPa

Applicable fuel:Natural gas, light oil, etc.

consult
HOT

H6 Gas Fired Hot Water Boiler

Capacity:0.7-2.8Mw

Rated thermal efficiency: 97.2-106%

Fixed working pressure:0.1MPa

Applicable fuel:Natural gas, etc.

consult
HOT

T7 Vacuum Hot Water Boilerr

Capacity:2.8-7.0Mw

Rated thermal efficiency:≥105.5%

Fixed working pressure:-0.02MPa

Applicable fuel:Natural gas, etc.

consult
HOT

V6 Gas Fired Hot Water Boiler

Capacity:99Kw

Rated thermal efficiency:97.2-104.4%

Fixed working pressure:1.0MPa

Applicable fuel:Natural gas, etc.

consult
HOT

Electric Steam Boiler

Capacity:0.5-4.0 t/h

Rated thermal efficiency:98%

Fixed working pressure:≤1.25MPa

Applicable fuel:electric energy

consult

Leave us a message

We will send out plans and quotations within five minutes

Name (optional)

Email

Whatsapp

Choose product type

Message

boilermanufactory

Get display discount

boiler
Contact us

Global Sales Hotline:
0086-371-60922096

Email: [email protected]

Voicemail
  • MSFTII-6 MASTERSPEC

    SECTION 23 52 33.19 - SAMPLE SPECIFICATION FOR RBI FUTERA II BOILER PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes gas-fired, finned copper water tube Get Price

  • Section 23 08 11 - DEMONSTRATIONS AND TESTS FOR …

    //section 01 91 00, general commissioning requirements.// section 23 05 10, common work results for boiler plant and steam generation. section 23 05 51, noise and vibration control for boiler plant. //section 23 08 00, commissioning of hvac systems.// section 23 09 11, instrumentation and control for boiler plant.Get Price

  • CHABOT - LAS POSITAS COMMUNITY COLLEGE DISTRICT …

    V.1 23 52 00 - Page 1 HEATING BOILERS SECTION 23 52 00 HEATING BOILERS PART 1 - GENERAL 1.1 SUMMARY A. Work Included: 1. Condensing Boilers PART 2 - PRODUCTS 2.1 MANUFACTURERS A. Condensing Boilers: 1. Cleaver Brooks 2. Aerco 3. Lochinvar 4. Hydrotherm 5. Buderus 2.2 CONDENSING BOILERS6. Or approved equivalent.Get Price

  • VA 23 52 33 Water-Tube Boilers - Whole Building …

    23 5233.13 - 1 FINNED WATER-TUBE BOILERS SECTION 23 5233.13 FINNED WATER-TUBE BOILERS PART 1 GENERAL 1.01SECTION INCLUDES A. Boilers. B. Controls and boiler trim. C. Hot water connections. D. Fuel connection. E. Collector, induced draft fan, and chimney connection. F. Circulator. G.Get Price

  • VA 23 52 39 Fire-Tube Boilers - Whole Building Design Guide

    23 52 39 - 1 SECTION 23 52 39 FIRE TUBE BOILERS SPEC WRITER NOTES: 1. Delete between // // if not PART 1 - GENERAL 1.1 DESCRIPTION A. This section specifies packaged fire tube boiler with trim (accessories), dual fuel (natural gas and No. …Get Price

  • standards for fire tube boilers

    Water Tube Boiler - Standards Search | Engineering360. Results 1 - 20 of 9305 1.1 General This European Standard applies to water-tube boilers with volumes in excess of two litres for the generation of steam and/or hot . read more+Get Price

  • END OF SECTION - UH

    23 5233 - 1 PACKAGED, MODULAR WATER-TUBE BOILERS SECTION 23 5233 PACKAGED, MODULAR WATER-TUBE BOILERS PART 1 GENERAL 1.01SECTION INCLUDES A. Packaged water-tube boilers. B. Boiler accessory equipment. C. Controls. D. Electrical power. E. Venting. 1.02RELATED REQUIREMENTS A. Section 03 3000 - Cast-in-Place Concrete. B. Section 08 9100 …Get Price

  • AtoJs Online — Appendix to the Journals of the House of

    The water-supply has been augmented by the installation of new mains, pressurereducing tank, and. by the raising of height of the dams. Nelson and Stoke : General maintenance-work has been carried out. Sunnyside : Alterations are being made to the boiler-house and a new chimney being erected. General maintenance-work was carried out as required.Get Price

  • Section 23 52 33 - WATER-TUBE BOILERS - Veterans Affairs

    AE Project Number: Hot Water Boilers 23 52 33 – 1 Revision Date: 01/29/2018 . SECTION 23 52 33 - HOT WATER BOILERS . PART 1 - GENERAL . 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section 23 01 00, "Mechanical General Provisions", govern this Section.Get Price

  • RBI MASTERSPEC MSFTFX-4 - Mestek

    1 MSFTFX-4 SECTION 23 52 33.19 - SAMPLE SPECIFICATION FOR RBI FUTERA FUSION XLF BOILER PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A.Get Price

  • SECTION 23 52 16.16 SAMPLE SPECIFICATION FOR …

    MACH Boilers Page 1 Section 23 52 16.16 Part 1 - GENERAL 1.01 RELATED DOCUMENTS A. ANSI Z21.13 / CSA 4.9 (Gas Fired Low Pressure Steam and Hot Water Boilers) B. ASME Section IV ("H" Stamp Heating Boilers) The boiler completed heat …Get Price

  • UFGS 23 52 33.03 20 Water-Tube Boilers, Oil/Gas or Oil

    SECTION TABLE OF CONTENTS DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC) SECTION 23 52 33.03 20 WATER-TUBE BOILERS, OIL/GAS OR OIL 11/08, CHG 3: 08/18 PART 1 GENERAL 1.1 REFERENCES 1.2 RELATED REQUIREMENTS 1.3 SYSTEM DESCRIPTION 1.3.1 Design Requirements 1.3.1.1 Boiler Design and Service Conditions 1.3.1.2 EconomizerGet Price

  • SECTION 23 07 00 - SYSTEM INSULATION PART 1 - …

    PART 1 - GENERAL . 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section 23 01 00, "Mechanical General Provisions", govern this Section. surge and water storage tanks 1"] Boiler stack and breeching 2" Outside air fans 1" Condensate drain pans 1"Get Price

  • Section 23 52 39 - FIRE-TUBE BOILERS - Veterans Affairs

    //section 23 08 11, demonstrations and tests for boiler plant.// section 23 09 11, instrumentation and control for boiler plant. section 23 21 11, boiler plant piping systems. section 23 50 11, boiler plant mechanical equipment. section 23 51 00, breechings, chimneys, and stacks. section 26 05 33, raceway and boxes for electrical systems.Get Price

  • SECTION 23 57 10 – CLEAN STEAM GENERATORS AND …

    PART 1 - GENERAL . 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section 23 01 00, "Mechanical General Provisions", govern this Section. When the level sensor calls for feed water, the boiler feed pumps shall turn on as indicated by the sequence of operations.Get Price

  • VA 23 52 33 Water-Tube Boilers - Whole Building Design Guide

    PART 1 - GENERAL 1.1 DESCRIPTION A. This section specifies packaged water tube boiler with trim (accessories), dual fuel (natural gas and fuel oil) burner, fuel trains//, and flue gas economizer//. B. A complete listing of common acronyms and abbreviations are included in Section 23 05 10, COMMON WORK RESULTS FOR BOILER PLANT AND STEAM GENERATION.Get Price

  • Section 23 21 11 - BOILER PLANT PIPING SYSTEMS

    Boiler and Economizer Service: Refer to Section 23 52 39, FIRE-TUBE BOILERS or Section 23 52 33, WATER-TUBE BOILERS. SPEC WRITER NOTE: Flow capacities of safety valves located at the outlet of pressure reducing stations shall be sufficient for the maximum capacity of the largest pressure reducing valve, or the wide-open bypass valve, whichever Get Price

  • SECTION 23 5233 WATER-TUBE BOILERS PART 1 GENERAL 1

    23 5233 - 1 WATER-TUBE BOILERS SECTION 23 5233 WATER-TUBE BOILERS PART 1 GENERAL 1.01SECTION INCLUDES A. Packaged water-tube boilers. B. Boiler accessory equipment. C. Water pre-treatment equipment. D. Water treatment. E. Controls. F. Electrical power. G. Venting. 1.02RELATED REQUIREMENTS A. Section 03 3000 - Cast-in-Place Concrete.Get Price

  • SECTION 23 5233.16 STEEL WATER-TUBE BOILERS PART 1 …

    SECTION 23 5233.16 STEEL WATER-TUBE BOILERS PART 1 GENERAL 1.01SECTION INCLUDES 23 5233.16 - 1 STEEL WATER-TUBE BOILERS SECTION 23 5233.16 STEEL WATER-TUBE BOILERS PART 1 GENERAL 1.01SECTION INCLUDES A. Boilers. B. Controls and boiler trim. C. Indoor/outdoor reset controller. D. Hot water connections. E. Fuel burning system and …Get Price

  • SECTION 23 5233.13 FINNED WATER-TUBE BOILERS PART 1

    Section 23 52 33 - WATER-TUBE BOILERSGet Price

  • VA 23 21 11 Boiler Plant Piping Systems - WBDG

    23 21 11 - 2 R. Section 23 50 11, BOILER PLANT MECHANICAL EQUIPMENT. S. Section 23 52 33, WATER-TUBE BOILERS. T. Section 23 52 39, FIRE-TUBE BOILERS. 1.3 APPLICABLE PUBLICATIONS SPEC WRITER NOTE: 1.Make material requirements agree with requirements specified in the referenced Applicable Publications. Verify andGet Price

  • SECTION 23 2214 STEAM AND CONDENSATE HEATING …

    FLEXIBLE STEEL WATER-TUBE BOILERS . Form 2126 . SECTION 23 52 33 - STEEL WATER-TUBE BOILERS . PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Contract Documents to include Conditions and Drawings. 1.2 SUMMARY A. This Section includes packaged flexible water-tube boilers for generating hot water. 1. Boilers. 2. Controls and boiler trim. 3. Fuel Get Price

  • END OF SECTION - UH

    SECTION 23 52 33 - HOT WATER BOILERS. PART 1 - GENERAL. RELATED DOCUMENTS: The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section 23 01 00, "Mechanical General Provisions", govern this Section.Get Price

  • 32-00035 01 - Honeywell SLATE ICM Platform

    23 52 33 WATER-TUBE BOILERS . 23 52 39 FIRE-TUBE BOILERS . PART 1 GENERAL . 1.1 SUMMARY . 1.2 RELATED SECTIONS . A. SECTION 23 09 13.33 – Control Valves . B. SECTION 23 09 13.43 – Control Dampers . C. SECTION 23 09 23 – Direct-Digital Control Systems for HVAC . D. SECTION 23 09 33 – Electric and Electronic Control Systems for HVACGet Price

  • Flexible Water Tube Boilers from Bryan Boilers High

    SECTION 23 52 33 - STEEL WATER-TUBE BOILERS. GENERAL. RELATED DOCUMENTS. Contract Documents to include Conditions and Drawings. SUMMARY. This Section includes packaged flexible water-tube boilers for generating hot water. Boilers. Controls and boiler trim. Fuel burning system. SUBMITTALS.Get Price

  • FLEXCORE SERIES MASTERSPEC MSFC-4 - Mestek

    1 FLEXCORE SERIES MASTERSPEC MSFC-4 SECTION 23 52 16 - CONDENSING HIGH EFFICIENCY STAINLESS STEEL FIRETUBE BOILERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A.Get Price

  • SECTION 23 52 16.13 SAMPLE SPECIFICATION FOR …

    STORM Boilers Page 1 Section 23 52 16.13 SECTION 23 52 16.13 SAMPLE SPECIFICATION FOR STAINLESS-STEEL CONDENSING BOILERS HARSCO INDUSTRIAL, PATTERSON-KELLEY STORM™ CONDENSING BOILERS W/ NURO® CONTROL Part 1 - GENERAL 1.01 RELATED DOCUMENTS A. ANSI Z21.13 / CSA 4.9 (Gas Fired Low Pressure Steam and Hot Water Boilers)Get Price

Discount
7X24 Online