Press the left button, drag the mouse, rotate the cube, see more information

Limit Discounts

Through this webpage, choose online customer service communication, or message board. Leave your needs and get limited time discounts, up to 10% off, saving you a fortune. This discount has an indefinite period, and places are limited on a first-come, first-served basis.

Payment Method

We support various payment methods:
T/T payment
VISA
paypal
MasterCard
Alipay etc
Save time in your buying process.

Certified Product

The company's products have passed multiple national
certifications:
for example:
United States: ASME
EU: CE
Eastern Europe: EAC
Russia: GOST
Singapore: MOMO
etc
Buy products, buy with confidence, use with confidence

Product Type

Domestic hot water and heating series: gas hot water boiler, vacuum hot water boiler, vertical atmospheric pressure hot water boiler, electric hot water boiler Factory use, high temperature steam: wns fuel gas steam boiler, szs water tube steam boiler, vertical steam boiler, electric steam boiler

About Us

FANGKUAI is founded in 1998, which is a clean fuel boiler enterprise integrating R&D, manufacturing, sales and service. In the past 20 years of development and innovation, the company has grown into a global enterprise, and its products have been exported to more than 80 countries including Russia, Mongolia and Thailand, and have established long-lasting cooperative relations with local enterprises!

Contact Us

If you are interested in our company or products, you can contact with us through online consulting, demand table submission, e-mails and telephones. Our staff shall wholeheartedly provide product information, application knowledge and good service for you.

SA965 vs SA182 - Boiler and Pressure Vessel engineering

  • Offshore price : $20000-$100000 Get a quote on the right form
  • Minimum order quantity : 1 set :SA965 vs SA182 - Boiler and Pressure Vessel engineering
  • Supply Capacity : 10 units/month :SA965 vs SA182 - Boiler and Pressure Vessel engineering
  • Manufacturer/Brand : Fangkuai boiler
  • Port : Anyang
  • payment terms : Letter of Credit, Wire Transfer, VISA

Leave Your Message And Get Price!

I need the quotation of , the fuel is , this capacity is , use for . My Name is , my Email is , my WhatsApp is , Please Send the detail information for me!

Popular products

HOT

θrion Gas Fired Steam Boiler

Capacity:1-20t/h

Rated thermal efficiency: 100-104%

Fixed working pressure: ≤1.6MPa

Applicable fuel:natural gas etc.

consult
HOT

Gas(oil) Fired Integrated Hot Water Boiler

Capacity:0.7-14MW

Rated thermal efficiency:96-98%

Fixed working pressure:≤1.25MPa

Applicable fuel:Natural gas, light oil, etc.

consult
HOT

H6 Gas Fired Hot Water Boiler

Capacity:0.7-2.8Mw

Rated thermal efficiency: 97.2-106%

Fixed working pressure:0.1MPa

Applicable fuel:Natural gas, etc.

consult
HOT

T7 Vacuum Hot Water Boilerr

Capacity:2.8-7.0Mw

Rated thermal efficiency:≥105.5%

Fixed working pressure:-0.02MPa

Applicable fuel:Natural gas, etc.

consult
HOT

V6 Gas Fired Hot Water Boiler

Capacity:99Kw

Rated thermal efficiency:97.2-104.4%

Fixed working pressure:1.0MPa

Applicable fuel:Natural gas, etc.

consult
HOT

Electric Steam Boiler

Capacity:0.5-4.0 t/h

Rated thermal efficiency:98%

Fixed working pressure:≤1.25MPa

Applicable fuel:electric energy

consult

Leave us a message

We will send out plans and quotations within five minutes

Name (optional)

Email

Whatsapp

Choose product type

Message

boilermanufactory

Get display discount

boiler
Contact us

Global Sales Hotline:
0086-371-60922096

Email: [email protected]

Voicemail
  • 2021 ASME Boiler and Pressure Vessel Code | BPVC | IHS

    Today, more than ever, Code users around the world – boiler/pressure vessel manufacturers, operators, stamp holders and inspectors – rely on the updated information to ensure safety and compliance. The 2021 ASME BPVC officially is the latest edition and …Get Price

  • NBBI - The National Board of Boiler and Pressure Vessel

    Promote greater safety through uniformity in the construction, installation, repair, maintenance and inspection of boilers and pressure vessels. The standards themselves are not on-line and must be ordered. Includes links for ordering the standards of Canada, Europe, and Great Britain.Get Price

  • Pressure Vessels - processdesign

    Mar 01, 2015 · Codes for pressure vessels can be found in the ASME Boiler and Pressure Vessel Code (ASME BPV code). While there is no formal definition, generally any closed vessel over 150 mm in diameter and that will experience a pressure difference of greater than 0.5 bar can be classified as pressure vessels.Get Price

  • Part 2, Section II—Materials and Specifications - ASME

    This chapter presents various specifications for the materials used in the construction of boilers. The first section of this chapter traces the chronological evolution of materials and associated technologies, from the need for materials to accommodate riveted construction to the acceptance of fusion welding as a fabrication process.Get Price

  • Darren Marsh, P.Eng., CRM on LinkedIn: Boiler & Machinery

    Boiler and pressure vessel inspections are required by law to reduce the chance of catastrophic accidents. Check out our infographic to learn about two types of inspections.Get Price

  • Boiler Operation Engineering By P Chattopadhyay

    Process - Chemical Engineering WorldBoiler - WikipediaHome - National Association of Power EngineersDesign Guide For Heat Exchanger Piping - Piping Engineering2021 ASME Boiler & Pressure Vessel CodePower Engineers, Boiler, Pressure Vessel and Refrigeration Aquastats: Setting & Wiring Heating System Boiler Aquastat Boiler design Get Price

  • (PDF) 2010 ASME Boiler and Pressure Vessel Code A N I …

    Jan 05, 2017 · A boiler is a very specific kind of pressure vessel, with specific rules applied to it and its support equipment. See ASME Section I and ASME B31.1 for more details. There are all sorts of devices designed to generate vapour from liquids, including water, for process uses, that are not classed as ASME I boilers.Get Price

  • Boiler and Pressure Vessel engineering Forum - Eng-Tips

    We work to many ASME standards to design and validate pressure vessels, boiler, fittings and piping systems. We have experience designing thousands of vessels and fittings to multiple codes. Pressure vessel design to ASME VIII-1 and VIII-2; Hot water heaters and boilers to ASME I and IV; Piping to B31.1, B31.3, B31.5 and othersGet Price

  • MSC Guidelines for Pressure Vessels - United States Coast

    Feb 16, 2017 · MSC Guidelines for Pressure Vessels Procedure Number: E1 -19 Revision Date: 02/16/2017 . U. S. Coast Guard Marine Safety Center 1 . S. T. Brady, CDR, Chief, Engineering Division . a. 46 CFR Part 54 – Pressure Vessels. b. ASME Boiler and Pressure Vessel Code(BPVC), Section VIII, Division 1, (1998 Edition)Get Price

  • ASTM ASME SA182 F51 Tubesheet for Heat Exchanger

    Boiler and Pressure Vessel engineering (37451 members) forum794 - Professional forum and technical support for engineers for Boiler and Pressure Vessel engineering.Get Price

  • Appendix E. Pressure Vessels and Piping Overpressure

    Some pressure vessel codes use a design margin of 3^4 times the material strength required at the design pressure (ASME 1999, ASME 2013). The vessel is also typically hydrotested at a pressure of 1.3-1.5 times the MAWP. Other boiler and pressure vessel codes will use similar concepts but may have different design margins.Get Price

  • Sizing Pressure-Relief Devices - AIChE

    Board of Boiler and Pressure Vessel Inspectors. Code certification involves conducting flow tests under conditions specified in the ASME code. The pressure vessel accumulation is the pressure increase above the MAWP, usually expressed as a percentage of the MAWP. When the relief device is at the MAWP, the over-pressure and accumulation are equal.Get Price

  • Extracted Pages From Section IX-2015 | Ultimate Tensile

    2015 ASME Boiler & Pressure Vessel Code 2015 Edition. July 1, 2015. IX. QUALIFICATION STANDARD FOR WELDING, BRAZING, AND FUSING PROCEDURES; WELDERS; BRAZERS; AND WELDING, BRAZING, AND FUSING OPERATORS. ASME Boiler and Pressure Vessel Committee on Welding, Brazing, and Fusing. Two Park Avenue New York, NY 10016 USA ASME BPVC.IX-2015. …Get Price

  • in Cylindrical Pressure Vessels Using Finite Element Analysis

    Boiler and Pressure Vessel Inspectors, 2002). The number of fatalities as a direct result of boiler and pressure vessel accidents has been recorded as 127 over the past 10 years (Air-con ditioning, Heating, Refrigeration- The News (2002). During the reported period between 2001 an d 2008, the statistics show that the rate ofGet Price

  • SA965 vs SA182 - Boiler and Pressure Vessel engineering

    ASME Boiler and Pressure Vessel CodeGet Price

  • :: ASTM A234/ASME SA234 :: A/SA516-70, A/SA515 - Unisteels

    Certificate & Inspection : c/w Calibration Works Certificate EN10204 3.1/DIN 50049 3.1/ISO10474 3.1 Mill Test Report, NACE MRKefid/NACE MRKefid/ISO-15156, CE Marked, European Pressure Equipment Directive PED 97/23/EC, AD 2000-WO, ASME Boiler & Pressure Vessel Code Section-II Part-A Edition 2008, API 6A, with 3.2 certificate duly certified Get Price

  • SA182 Vs SA965 - Boiler and Pressure Vessel …

    SA182 Vs SA965 - Boiler and Pressure Vessel engineering Get Price

  • How Do Pressure Vessel Requirements Change State to State

    Although most pressure vessels in the USA have been built to Section VIII of the ASME Boiler and Pressure Vessel Code (BPVC), the actual requirements for the design, manufacture and operation of pressure vessels are defined at state level. This …Get Price

  • Rules and Regulations for Boiler and Pressure Vessel

    BOILER AND PRESSURE VESSEL INSPECTION (R.I.G.L. - 28-25) Revised July 2011 RI Department of Labor & Training Division of Occupational Safety Boiler Inspection Unit 1511 Pontiac Avenue P.O. Box 20157 Cranston, RI 02920-0942 Office#:(401)462-8577 Fax#:(401)462-8576. i …Get Price

  • Pipes and Pipe Sizing - Spirax Sarco

    A table of pressure factor values is used in Equation 10.2.8 to determine the pressure drop factor for a particular installation. Example 10.2.2 Consider the system shown in Figure 10.2.6, and determine the pipe size required from the boiler to the unit heater branch line.Get Price

  • Pressure Vessel Engineering – Pressure Vessel Engineering

    Boiler vs Pressure vessel - ASME (mechanical) Code Issues - Eng-TipsGet Price

  • Boiler and Pressure Vessel Certification | ASME - ASME

    The ASME BPVC Certification Program conforms to the rules governing the design, fabrication, assembly, and inspection of boiler and pressure vessel components during construction. In 1916, shortly after the first publication of the "Rules for the Construction of Stationary Boilers and for Allowable Working Pressures" (known today as the ASME Get Price

  • China ASME SA-965 SA965/SA-965M SA 965 F304L F316L F321

    We are professional ASME SA-965 SA965/SA-965M SA 965 F304L F316L F321 F347 304 316 347H Tube sheets Baffles Tube Support plates Tubesheets From china Tubesheet is widely used in shell and tube heat exchanger, boiler, pressure vessel, steam turbine, large central air Conditioning, etc.Get Price

  • BOILER AND PRESSURE VESSEL CERTIFICATES OF …

    For any manufacturer of mass produced or multiple duplicate pressure vessels or boilers operating to the requirements of Section VIII, UG- 90(c)(2), Section IV, HG-515.4(b) Section X, RI-160 or Section XII, TS-200.7, the Team Leader is appointed by either ASME or the National Board of Boiler and Pressure Vessel Inspec tors.Get Price

  • API 510 (2006): Pressure Vessel Inspection Code: In

    considered to be applicable to pressure vessels in most services. ASME's Boiler and Pres­ sure Vessel Committee adopted substantially identical provisions and published them as a nonmandatory appendix in the 1950, 1952, 1956, and 1959 editions of Section VIII of the ASME Boiler and Pressure Vessel Code.Get Price

  • Boiler and Pressure Vessel Certification | ASME - ASME

    2010 ASME Boiler and Pressure Vessel Code A N I N T E R N A T I O N A L C O D E II Part D Properties (Metric. Juan Frech. Download Download PDF. Full PDF Package Download Full PDF Package. This Paper. A short summary of this paper. 21 …Get Price

  • BOILER AND PRESSURE VESSEL REGULATIONS OF THE …

    (a) For the construction of new boilers and pressure vessels, the ASME Boiler and Pressure Vessel Code, sections I, IV, V, VIII-Divisions 1 and 2 and 3, IX, X, 2010 edition, including the 2011 addenda, and B31.1, 2010 edition. (b) For in service inspection, repairs, alterations and re-rating of boilers and pressure vesselsGet Price

  • Meaning and Requirements of ASME U Stamp on Pressure

    Such inspectors are commissioned by the National Board of Boiler and Pressure Vessel Inspectors. A complete data report is furnished in the form U-1 containing the signature of the authorized inspector. The manufacturers of such pressure vessels need to be registered to the National Board for the production of ASME U stamped pressure vessels.Get Price

  • ASME Boiler and Pressure Vessel Code - ASME

    Note: For books other than the Boiler & Pressure Vessel Code (e.g., B31.1, PTC 25, NQA-1), the required edition as of July 1, 2013 is listed. The specific effective Addenda will be referenced in the applicable Boiler and Pressure Vessel Code section. Later …Get Price

  • (PDF) SECTION II ASME Boiler and Pressure Vessel Code An

    SECTION II ASME Boiler and Pressure Vessel Code An International Code. ASME II PART D - CUSTOMARY (2019), 2019. J. Puntay Rojas. Download Download PDF. Full PDF Package Download Full PDF Package. This Paper. A short summary of this paper. 1 Full PDF related to this paper. Read Paper.Get Price

Discount
7X24 Online