Press the left button, drag the mouse, rotate the cube, see more information

Limit Discounts

Through this webpage, choose online customer service communication, or message board. Leave your needs and get limited time discounts, up to 10% off, saving you a fortune. This discount has an indefinite period, and places are limited on a first-come, first-served basis.

Payment Method

We support various payment methods:
T/T payment
VISA
paypal
MasterCard
Alipay etc
Save time in your buying process.

Certified Product

The company's products have passed multiple national
certifications:
for example:
United States: ASME
EU: CE
Eastern Europe: EAC
Russia: GOST
Singapore: MOMO
etc
Buy products, buy with confidence, use with confidence

Product Type

Domestic hot water and heating series: gas hot water boiler, vacuum hot water boiler, vertical atmospheric pressure hot water boiler, electric hot water boiler Factory use, high temperature steam: wns fuel gas steam boiler, szs water tube steam boiler, vertical steam boiler, electric steam boiler

About Us

FANGKUAI is founded in 1998, which is a clean fuel boiler enterprise integrating R&D, manufacturing, sales and service. In the past 20 years of development and innovation, the company has grown into a global enterprise, and its products have been exported to more than 80 countries including Russia, Mongolia and Thailand, and have established long-lasting cooperative relations with local enterprises!

Contact Us

If you are interested in our company or products, you can contact with us through online consulting, demand table submission, e-mails and telephones. Our staff shall wholeheartedly provide product information, application knowledge and good service for you.

SECTION 23 5233 WATER-TUBE BOILERS PART 1

  • Offshore price : $20000-$100000 Get a quote on the right form
  • Minimum order quantity : 1 set :SECTION 23 5233 WATER-TUBE BOILERS PART 1
  • Supply Capacity : 10 units/month :SECTION 23 5233 WATER-TUBE BOILERS PART 1
  • Manufacturer/Brand : Fangkuai boiler
  • Port : Anyang
  • payment terms : Letter of Credit, Wire Transfer, VISA

Leave Your Message And Get Price!

I need the quotation of , the fuel is , this capacity is , use for . My Name is , my Email is , my WhatsApp is , Please Send the detail information for me!

Popular products

HOT

θrion Gas Fired Steam Boiler

Capacity:1-20t/h

Rated thermal efficiency: 100-104%

Fixed working pressure: ≤1.6MPa

Applicable fuel:natural gas etc.

consult
HOT

Gas(oil) Fired Integrated Hot Water Boiler

Capacity:0.7-14MW

Rated thermal efficiency:96-98%

Fixed working pressure:≤1.25MPa

Applicable fuel:Natural gas, light oil, etc.

consult
HOT

H6 Gas Fired Hot Water Boiler

Capacity:0.7-2.8Mw

Rated thermal efficiency: 97.2-106%

Fixed working pressure:0.1MPa

Applicable fuel:Natural gas, etc.

consult
HOT

T7 Vacuum Hot Water Boilerr

Capacity:2.8-7.0Mw

Rated thermal efficiency:≥105.5%

Fixed working pressure:-0.02MPa

Applicable fuel:Natural gas, etc.

consult
HOT

V6 Gas Fired Hot Water Boiler

Capacity:99Kw

Rated thermal efficiency:97.2-104.4%

Fixed working pressure:1.0MPa

Applicable fuel:Natural gas, etc.

consult
HOT

Electric Steam Boiler

Capacity:0.5-4.0 t/h

Rated thermal efficiency:98%

Fixed working pressure:≤1.25MPa

Applicable fuel:electric energy

consult

Leave us a message

We will send out plans and quotations within five minutes

Name (optional)

Email

Whatsapp

Choose product type

Message

boilermanufactory

Get display discount

boiler
Contact us

Global Sales Hotline:
0086-371-60922096

Email: [email protected]

Voicemail
  • RBI MASTERSPEC MSFTFX-4 - Mestek

    A. This Section includes gas-fired, condensing finned copper water tube boilers for heating hot water. B. Related Sections include the following: 1. Division 23 Section "Breechings, Chimneys, and Stacks" for connections to breechings, chimneys, and stacks. 2. Division 23 Section "Feedwater Equipment" for connections to condensate and Get Price

  • SECTION 23 5233.13 FINNED WATER-TUBE BOILERS PART 1

    Section 23 52 33 - WATER-TUBE BOILERSGet Price

  • Brown University New July 26, 2013 Facilities Design

    Jul 23, 2013 · 23 52 00 - 1 of 4 Heating Boilers SECTION 23 52 00 – HEATING BOILERS . PART 1 - GENERAL . 1.1 SUMMARY A. This section includes design and performance requirements for electric boilers, condensing boilers, and other boilers, for space heating and/or Process use. Boilers for domestic hot water production are addressed in Section 22 34 00. B.Get Price

  • SECTION 23 5233.16 STEEL WATER-TUBE BOILERS PART 1 …

    Section 23 52 33 - WATER-TUBE BOILERSGet Price

  • VA 23 52 33 Water-Tube Boilers - Whole Building Design Guide

    23 52 33 - 1 SECTION 23 52 33 WATER TUBE BOILERS SPEC WRITER NOTES: 1. Delete between // // if not applicable to project. Also delete any other item or paragraph not applicable in the Section and renumber the paragraphs. 2. References to pressure in this section are gauge pressure unless otherwise noted. 3. Two types of high pressure water tubeGet Price

  • 32-00035 01 - Honeywell SLATE ICM Platform

    with specified packaged boiler manufactures, "Copy and Paste" both Items 1.2 and 2.3 in project MasterSpec specification. 23 52 00 HEATING BOILER . 23 52 23 CAST-IRON BOILERS . 23 52 33 WATER-TUBE BOILERS . 23 52 39 FIRE-TUBE BOILERS . PART 1 GENERAL . 1.1 SUMMARY . 1.2 RELATED SECTIONS . A. SECTION 23 09 13.33 – Control ValvesGet Price

  • Section 23 52 33 - WATER-TUBE BOILERS - Veterans Affairs

    23 5233.13 - 1 FINNED WATER-TUBE BOILERS SECTION 23 5233.13 FINNED WATER-TUBE BOILERS PART 1 GENERAL 1.01SECTION INCLUDES A. Boilers. B. Controls and boiler trim. C. Hot water connections. D. Fuel connection. E. Collector, …Get Price

  • Section 23 21 11 - BOILER PLANT PIPING SYSTEMS

    Boiler and Economizer Service: Refer to Section 23 52 39, FIRE-TUBE BOILERS or Section 23 52 33, WATER-TUBE BOILERS. SPEC WRITER NOTE: Flow capacities of safety valves located at the outlet of pressure reducing stations shall be sufficient for the maximum capacity of the largest pressure reducing valve, or the wide-open bypass valve, whichever Get Price

  • SECTION 23 5233 PACKAGED, MODULAR WATER-TUBE …

    23 5233 - 1 PACKAGED, MODULAR WATER-TUBE BOILERS SECTION 23 5233 PACKAGED, MODULAR WATER-TUBE BOILERS PART 1 GENERAL 1.01SECTION INCLUDES A. Packaged water-tube boilers. B. Boiler accessory equipment. C. Controls. D. Electrical power. E. Venting. 1.02RELATED REQUIREMENTS A. Section 03 3000 - Cast-in-Place Concrete. B. Section 08 9100 …Get Price

  • END OF SECTION - UH

    SECTION 23 52 33 - HOT WATER BOILERS. PART 1 - GENERAL. RELATED DOCUMENTS: The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section 23 01 00, "Mechanical General Provisions", govern this Section.Get Price

  • FLEXIBLE STEEL WATER-TUBE BOILERS SECTION 23 …

    23 5233.16 - 1 STEEL WATER-TUBE BOILERS SECTION 23 5233.16 STEEL WATER-TUBE BOILERS PART 1 GENERAL 1.01SECTION INCLUDES A. Boilers. B. Controls and boiler trim. C. Indoor/outdoor reset controller. D. Hot water connections. E. Fuel burning system and connection. F. Chimney connection. 1.02RELATED REQUIREMENTS A. Section 03 3000 - Cast-in-Place Get Price

  • 23 52 33 (15512) - Water Tube Boilers - Alberta

    .1 Start and test boilers as specified in Section 23 08 13 and 23 08 23. END OF SECTION. BMS Basic Master Specification Alberta Infrastructure. Master Specification System Page 0 LEED Notes and Credits Section 23 52 33. Kefid Water Tube Boilers BMS Basic Master Specification Alberta Infrastructure. Master Specification System Page 0Get Price

  • UFGS 23 52 33.03 20 Water-Tube Boilers, Oil/Gas or Oil

    SECTION TABLE OF CONTENTS DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC) SECTION 23 52 33.03 20 WATER-TUBE BOILERS, OIL/GAS OR OIL 11/08, CHG 3: 08/18 PART 1 GENERAL 1.1 REFERENCES 1.2 RELATED REQUIREMENTS 1.3 SYSTEM DESCRIPTION 1.3.1 Design Requirements 1.3.1.1 Boiler Design and Service Conditions 1.3.1.2 EconomizerGet Price

  • SECTION 23 52 16.16 SAMPLE SPECIFICATION FOR …

    MACH Boilers Page 1 Section 23 52 16.16 SECTION 23 52 16.16 SAMPLE SPECIFICATION FOR ALUMINUM CONDENSING BOILERS FOR CHLORINE APPLICATIONS Part 1 - GENERAL 1.01 RELATED DOCUMENTS A. ANSI Z21.13 / CSA 4.9 (Gas Fired Low Pressure Steam and Hot Water Boilers) The boiler completed heat exchanger shall be of the water tube style andGet Price

  • Section 23 08 11 - DEMONSTRATIONS AND TESTS FOR …

    section 23 09 11, instrumentation and control for boiler plant. section 23 10 00, facility fuel systems. section 23 21 11, boiler plant piping systems. section 23 50 11, boiler plant mechanical equipment. section 23 52 33, water-tube boilers. section 23 52 39, fire-tube boilers. applicable publications. spec writer noteGet Price

  • Section 23 52 39 - FIRE-TUBE BOILERS - Veterans Affairs

    SECTION 23 52 39. FIRE TUBE BOILERS. SPEC WRITER NOTES: 1.Delete between // // if not applicable to project. Also delete any other item or paragraph not applicable in the Section and renumber the paragraphs. 2.References to pressure are gauge pressure unless otherwise noted.Get Price

  • SECTION 23 5233 WATER-TUBE BOILERS PART 1 GENERAL 1

    23 5233 - 3 WATER-TUBE BOILERS C. ASHRAE Std 90.1 Compliance: Boilers shall have minimum efficiency according to "Gas and Oil Fired Boilers - Minimum Efficiency Requirements." D. UL Compliance: UL 726 and UL 795. E. Boilers shall be listed and labeled by a testing agency acceptable to Authority Having Jurisdiction.Get Price

  • VA 23 52 39 Fire-Tube Boilers - Whole Building Design Guide

    23 52 39 - 1 SECTION 23 52 39 FIRE TUBE BOILERS SPEC WRITER NOTES: 1. Delete between // // if not applicable to project. Also delete any other item or paragraph not applicable in the Section and renumber the paragraphs. 2. References to pressure are gauge pressure unless otherwise noted. 3. This specification includes highGet Price

  • VA 23 21 11 Boiler Plant Piping Systems - WBDG

    23 21 11 - 2 R. Section 23 50 11, BOILER PLANT MECHANICAL EQUIPMENT. S. Section 23 52 33, WATER-TUBE BOILERS. T. Section 23 52 39, FIRE-TUBE BOILERS. 1.3 APPLICABLE PUBLICATIONS SPEC WRITER NOTE: 1.Make material requirements agree with requirements specified in the referenced Applicable Publications. Verify andGet Price

  • SECTION 23 52 23 CAST-IRON BOILERS PART 1 DESIGN

    Jul 23, 2016 · Denver Public Schools – Facility Management 23 52 23 Cast-Iron Boilers Technical Construction Guidelines Page 1 of 11 Update: April 2016 SECTION 23 52 23 CAST-IRON BOILERS PART 1 DESIGN REQUIREMENTS 1.01 REFERENCES A. AGA - Directory of Certified Appliances and Accessories. B. AGA Z21.13 - Gas-Fired Low-Pressure Hot Water Boilers.Get Price

  • SECTION 23 52 33.19 - SAMPLE SPECIFICATION FOR RBI

    SECTION 23 52 33.19 - SAMPLE SPECIFICATION FOR RBI DOMINATOR BOILER PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes gas-fired, finned copper water tube Get Price

  • Section 23 52 25 - LOW-PRESSURE WATER HEATING BOILERS

    SECTION 23 52 25. LOW-PRESSURE WATER HEATING BOILERS. SPEC WRITER NOTES: 1.Delete between // // if not applicable to project. Also delete any other item or paragraph not applicable in the section and renumber the paragraphs. 2.References to pressure are gauge pressure unless otherwise noted. 3.Get Price

  • FLEXCORE SERIES MASTERSPEC MSFC-4 - Mestek

    1 FLEXCORE SERIES MASTERSPEC MSFC-4 SECTION 23 52 16 - CONDENSING HIGH EFFICIENCY STAINLESS STEEL FIRETUBE BOILERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A.Get Price

  • UFGS 23 52 33.03 20 Water-Tube Boilers, Oil/Gas or Oil

    SECTION TABLE OF CONTENTS DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING SECTION 23 52 33.03 20 WATER-TUBE BOILERS, OIL/GAS OR OIL 11/08 PART 1 GENERAL 1.1 REFERENCES 1.2 RELATED REQUIREMENTS 1.3 SYSTEM DESCRIPTION 1.3.1 Design Requirements 1.3.1.1 Boiler Design and Service Conditions 1.3.1.2 Economizer 1.3.1.3 FansGet Price

  • CHAPTER 23.1-16 BOILER INSPECTION 23.1Kefid. …

    23.1Kefid. Inspection of boilers. 1. The chief boiler inspector shall inspect each boiler used or proposed to be used within this state. The inspection must be thorough as to the construction, installation, condition, and operation as provided by the rules adopted to implement this chapter.Get Price

Discount
7X24 Online